Form D Construction Agreement

Exterior Addition(s) to Original Unit

1.  Lot # _______________  2.  Date of Agreement ___________________

3.  Name(s) of Owner(s): _____________________________________________________

4a. Date of completion of original structure: __________ 4b. Date(s) of addition: __________

5.  Purpose of exterior addition: ________________________________________________

6a. Brief description of structure, specifying siding material and roof material.  Remember that these should be identical or compatible with the residential structure.  If they are not compatible, then you should indicate what plans you have to bring them into compliance.  If you have questions as to compatibility please get in touch with the architectural control committee for assistance.

__________________________________________________________________________

__________________________________________________________________________

6b.  Please include a sketch of external addition.

7.  Please include a plot plan showing the exterior structure with relation to lot boundaries, location of trees to be removed, and the residential structure.  Another reminder:  The architectural controls ask that "... whenever feasible supplemental structures be physically connected to one another by roof, screens, stone walkways or walls or other appropriate means."

________________________________________________________ Date ________________

________________________________________________________ Date ________________

Signature of Owner(s)

________________________________________________________ Date ________________

Acceptance of construction agreement by Edelweiss Architectural Control Committee

Back